Action Plan

The King’s Road Action Plan is a series of deliverable, fundable and practical projects. It sets out an exciting and integrated programme of projects which over time will ensure that the area is safer and more sustainable; and continues to thrive as an economically and culturally vibrant place into the future.

The Action Plan, like the other Kensington and Chelsea local action plans, will be regularly updated to align with local community priorities, as projects progress and are delivered.

The Action Plan will be delivered in partnership by stakeholders, including Kensington and Chelsea Council (K&C), Transport for London (TfL), the King’s Road Partnership (KRP), land owners, property owners, local businesses, and residents and community groups, working together to ensure a bright future for the King’s Road as an internationally-renowned shopping destination, great local high street, a place of culture, and a desirable place to work and live.

To be kept informed or to give your views on an existing or the need for a potential new project contact us at place@kingsrdpartnership.com or complete one of the feedback form.

Location Specific Projects

Better Footways Programme

Deliver footway widening and pedestrian crossing improvements at:

Better Footways Programme: Bluebird, No. 350 King's Road, both western and eastern accesses

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Bluebird, No. 350 King's Road, both western and eastern accesses

Better Footways Programme: Bramerton Street and Paultons Square (one way system)

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Bramerton Street and Paultons Square (one way system)

Better Footways Programme: Bywater Street

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Bywater Street

Better Footways Programme: Cheltenham Terrace

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

 

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Cheltenham Terrace

Better Footways Programme: Dovehouse Street

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Dovehouse Street

Better Footways Programme: Duke of York Square (vehicle entrance)

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Duke of York Square (vehicle entrance)

Better Footways Programme: Markham Square (east and west)

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Markham Square (east and west)

Better Footways Programme: Walpole Street

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Walpole Street

Better Footways Programme: Wellington Square

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Wellington Square

Improve Pedestrian Comfort and Safety

Better Footways Programme: Markham Street to Chelsea Manor Street (North side)

Resolve pedestrian pinch-points with potential measures including the removal of some bollards and any unnecessary street furniture; and where feasible introduce widening of the footways, while also maintaining adequate lane widths for traffic.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Markham Street to Chelsea Manor Street (North side)

Better Footways Programme: Radnor Walk and Shawfield Street (by Chelsea Potter)

Resolve pedestrian pinch-points with potential measures including the removal of some bollards and any unnecessary street furniture; and where feasible introduce widening of the footways, while also maintaining adequate lane widths for traffic.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Radnor Walk and Shawfield Street (by Chelsea Potter)

Better Footways Programme: Tyron Street to Markham Square (North side)

Resolve pedestrian pinch-points with potential measures including the removal of some bollards and any unnecessary street furniture; and where feasible introduce widening of the footways, while also maintaining adequate lane widths for traffic.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Tyron Street to Markham Square (North side)

Introduce continuous footway crossings at:

Better Footways Programme: Anderson Street

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Anderson Street

Better Footways Programme: Blacklands Terrace

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Blacklands Terrace

Better Footways Programme: Burnsall Street

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Burnsall Street

Better Footways Programme: Chelsea Manor Street (both north and south sides)

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Chelsea Manor Street (both north and south sides)

Better Footways Programme: Flood Street: currently raised table in carriageway surface materials

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Flood Street: currently raised table in carriageway surface materials

Better Footways Programme: Glebe Place

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Glebe Place

Better Footways Programme: Jubilee Place

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Jubilee Place

Better Footways Programme: Lincoln Street

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Lincoln Street

Better Footways Programme: Manresa Road

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Manresa Road

Better Footways Programme: Markham Street

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Markham Street

Better Footways Programme: Radnor Walk

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Radnor Walk

Better Footways Programme: Shawfield Street

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Shawfield Street

Better Footways Programme: Smith Street

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Smith Street

Better Footways Programme: The Vale

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

The Vale

Pedestrian Crossing Safety Improvements

Better Footways Programme: Beaufort Street

Introduce improvements to make it easier and safer for all to cross at busier or comparatively more complex junctions on the King’s Road.

Introduce green phases for pedestrians to eastern, southern and northern arms of the signalised junction (the western arm already has a pedestrian phase). Upgrade and increase the number of Advanced Stop Lines for cyclists.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Beaufort Street

Better Footways Programme: Chelsea Fire Station

Introduce improvements to make it easier and safer for all to cross at busier or comparatively more complex junctions on the King’s Road.

Introduce continuous footways and wayfinding to encourage footfall westbound beyond the fire station

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Chelsea Fire Station

Better Footways Programme: Old Church Street

Introduce improvements to make it easier and safer for all to cross at busier or comparatively more complex junctions on the King’s Road.

Introduce a pedestrian phase crossing on north side junction. Introduce tactile paving. Consider replacing illuminated signs to reduce energy use and reduce light pollution.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Old Church Street

Gateways and Places Programme

Gateways and Places Programme: King's Road midway

To improve the arrival experience, improve sight-lines, attract and sustain footfall and encourage exploration westbound by visitors with better public realm, wayfinding, space for art and activations.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Gateways and Places Programme

King's Road midway

Gateways and Places Programme: Park Walk Gateway

To improve the arrival experience, improve sight-lines, attract and sustain footfall and encourage exploration westbound by visitors with better public realm, wayfinding, space for art and activations

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Gateways and Places Programme

Park Walk Gateway

Gateways and Places Programme: Royal Avenue Piazza and King’s Road

To improve the arrival experience, improve sight-lines, attract and sustain footfall and encourage exploration westbound by visitors with better public realm, wayfinding, space for art and activations

Status

Not Commenced
Development
Design
Build
Completed
Find Out More

Feedback form

You are providing feedback for:

Gateways and Places Programme

Royal Avenue Piazza and King’s Road

Gateways and Places Programme: Sloane Square

To improve the arrival experience, improve sight-lines, attract and sustain footfall and encourage exploration westbound by visitors with better public realm, wayfinding, space for art and activations.

Status

Not Commenced
Development
Design
Build
Completed
Find Out More

Feedback form

You are providing feedback for:

Gateways and Places Programme

Sloane Square

Gateways and Places Programme: Symons Triangle

To improve the arrival experience, improve sight-lines, attract and sustain footfall and encourage exploration westbound by visitors with better public realm, wayfinding, space for art and activations.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Gateways and Places Programme

Symons Triangle

Gateways and Places Programme: World's End Square

To improve the arrival experience, improve sight-lines, attract and sustain footfall and encourage exploration westbound by visitors with better public realm, wayfinding, space for art and activations.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Gateways and Places Programme

World's End Square

Kings Road BID map

Better Footways Programme: Beaufort Street

Introduce improvements to make it easier and safer for all to cross at busier or comparatively more complex junctions on the King’s Road.

Introduce green phases for pedestrians to eastern, southern and northern arms of the signalised junction (the western arm already has a pedestrian phase). Upgrade and increase the number of Advanced Stop Lines for cyclists.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Beaufort Street

Better Footways Programme: Chelsea Fire Station

Introduce improvements to make it easier and safer for all to cross at busier or comparatively more complex junctions on the King’s Road.

Introduce continuous footways and wayfinding to encourage footfall westbound beyond the fire station

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Chelsea Fire Station

Better Footways Programme: Markham Street to Chelsea Manor Street (North side)

Resolve pedestrian pinch-points with potential measures including the removal of some bollards and any unnecessary street furniture; and where feasible introduce widening of the footways, while also maintaining adequate lane widths for traffic.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Markham Street to Chelsea Manor Street (North side)

Better Footways Programme: Radnor Walk and Shawfield Street (by Chelsea Potter)

Resolve pedestrian pinch-points with potential measures including the removal of some bollards and any unnecessary street furniture; and where feasible introduce widening of the footways, while also maintaining adequate lane widths for traffic.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Radnor Walk and Shawfield Street (by Chelsea Potter)

Better Footways Programme: Tyron Street to Markham Square (North side)

Resolve pedestrian pinch-points with potential measures including the removal of some bollards and any unnecessary street furniture; and where feasible introduce widening of the footways, while also maintaining adequate lane widths for traffic.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Tyron Street to Markham Square (North side)

Better Footways Programme: Old Church Street

Introduce improvements to make it easier and safer for all to cross at busier or comparatively more complex junctions on the King’s Road.

Introduce a pedestrian phase crossing on north side junction. Introduce tactile paving. Consider replacing illuminated signs to reduce energy use and reduce light pollution.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Old Church Street

Better Footways Programme: Anderson Street

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Anderson Street

Better Footways Programme: Blacklands Terrace

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Blacklands Terrace

Better Footways Programme: Burnsall Street

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Burnsall Street

Better Footways Programme: Chelsea Manor Street (both north and south sides)

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Chelsea Manor Street (both north and south sides)

Better Footways Programme: Flood Street: currently raised table in carriageway surface materials

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Flood Street: currently raised table in carriageway surface materials

Better Footways Programme: Glebe Place

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Glebe Place

Better Footways Programme: Jubilee Place

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Jubilee Place

Better Footways Programme: Lincoln Street

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Lincoln Street

Better Footways Programme: Manresa Road

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Manresa Road

Better Footways Programme: Markham Street

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Markham Street

Better Footways Programme: Radnor Walk

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Radnor Walk

Better Footways Programme: Shawfield Street

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Shawfield Street

Better Footways Programme: Smith Street

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Smith Street

Better Footways Programme: Bluebird, No. 350 King's Road, both western and eastern accesses

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Bluebird, No. 350 King's Road, both western and eastern accesses

Better Footways Programme: Bramerton Street and Paultons Square (one way system)

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Bramerton Street and Paultons Square (one way system)

Better Footways Programme: Bywater Street

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Bywater Street

Better Footways Programme: Cheltenham Terrace

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

 

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Cheltenham Terrace

Better Footways Programme: Dovehouse Street

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Dovehouse Street

Better Footways Programme: Duke of York Square (vehicle entrance)

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Duke of York Square (vehicle entrance)

Better Footways Programme: Markham Square (east and west)

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Markham Square (east and west)

Better Footways Programme: Walpole Street

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Walpole Street

Better Footways Programme: Wellington Square

On the King’s Road at key junctions replace existing stone sett raised-crossings with continuous footways in the same material as the existing footways; and either side of the junctions seek to declutter street furniture. In addition, where possible widen  footways to improve pedestrian comfort and access, while maintaining sufficient traffic lane widths and flows.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

Wellington Square

Better Footways Programme: The Vale

Introduce continuous footway crossings in the same materials as the footways at key junctions to provide pedestrian priority and improve accessibility.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Better Footways Programme

The Vale

Gateways and Places Programme: King's Road midway

To improve the arrival experience, improve sight-lines, attract and sustain footfall and encourage exploration westbound by visitors with better public realm, wayfinding, space for art and activations.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Gateways and Places Programme

King's Road midway

Gateways and Places Programme: Park Walk Gateway

To improve the arrival experience, improve sight-lines, attract and sustain footfall and encourage exploration westbound by visitors with better public realm, wayfinding, space for art and activations

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Gateways and Places Programme

Park Walk Gateway

Gateways and Places Programme: Royal Avenue Piazza and King’s Road

To improve the arrival experience, improve sight-lines, attract and sustain footfall and encourage exploration westbound by visitors with better public realm, wayfinding, space for art and activations

Status

Not Commenced
Development
Design
Build
Completed
Find Out More

Feedback form

You are providing feedback for:

Gateways and Places Programme

Royal Avenue Piazza and King’s Road

Gateways and Places Programme: Sloane Square

To improve the arrival experience, improve sight-lines, attract and sustain footfall and encourage exploration westbound by visitors with better public realm, wayfinding, space for art and activations.

Status

Not Commenced
Development
Design
Build
Completed
Find Out More

Feedback form

You are providing feedback for:

Gateways and Places Programme

Sloane Square

Gateways and Places Programme: Symons Triangle

To improve the arrival experience, improve sight-lines, attract and sustain footfall and encourage exploration westbound by visitors with better public realm, wayfinding, space for art and activations.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Gateways and Places Programme

Symons Triangle

Gateways and Places Programme: World's End Square

To improve the arrival experience, improve sight-lines, attract and sustain footfall and encourage exploration westbound by visitors with better public realm, wayfinding, space for art and activations.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Gateways and Places Programme

World's End Square

Area Wide Improvements Programme

Accessibility

Accessibility: Accessibility and inclusivity strategy

Work with Action Disability to audit the King’s Road and integrate proposals into each location specific project, encourage retailers to sign-up to ‘Offer a Seat’ programme, replace uneven surfaces at footways, public spaces

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Accessibility

Accessibility and inclusivity strategy

Accessibility: Digital accessibility strategy

Harness apps and technologies to make King’s Road accessible to people with additional needs.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Accessibility

Digital accessibility strategy

Accessibility: Public toilets

Work with building owners and occupiers to identify potential toilets that could be made publicly available and consider providing public toilets as part of new developments

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Accessibility

Public toilets

Place Management

Place Management: Improving personal safety and reducing crime

Expand CCTV coverage, fill gaps in active frontages, extend business funded private security and improve lighting at crime hotspots.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Place Management

Improving personal safety and reducing crime

Place Management: More recycling and improving waste collection

Accelerate business participation in the waste and recycling preferred supplier scheme, investigate waste consolidation opportunities and more frequent waste collections.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Place Management

More recycling and improving waste collection

Place Management: Respecting all communities

Encourage and campaign to ensure businesses and customers are considerate to residents; encourage cafes, bars and restaurants to meet the standards set by Purple Flag and encourage good management of premises in relation to noise and behaviour

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Place Management

Respecting all communities

Placemaking: Curation, Culture and Heritage

Placemaking: Curation, Culture and Heritage: Arts & Culture Programme

Celebrate the King’s Road’s history and rich cultural heritage, amplify the Chelsea Heritage Quarter, connect and encourage visits to the area’s key destination using wayfinding, consider appointing and artist in residence and explore a programme of public art along the King’s Road.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Placemaking: Curation, Culture and Heritage

Arts & Culture Programme

Placemaking: Curation, Culture and Heritage: Events Strategy

Develop a curated programme of music, temporary installations, music and pop-ups along the full length of the King’s Road, connect the east with the west.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Placemaking: Curation, Culture and Heritage

Events Strategy

Placemaking: Curation, Culture and Heritage: Retail Curation

Champion leasing strategies that complement the strong identity of the King’s Road and meet the needs of local residents and visitors; and trial alfresco dining in appropriate locations

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Placemaking: Curation, Culture and Heritage

Retail Curation

Sustainability and the Environment

Sustainability and the Environment: Active travel

Seek opportunities for more public cycle parking and work with agencies to reduce inappropriate parking of hire scooters and cycles

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Sustainability and the Environment

Active travel

Sustainability and the Environment: Decluttering

Reduce unnecessary street furniture and integrate furniture where possible. Develop and adopt a design framework for a consistent material palette and street furniture design

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Sustainability and the Environment

Decluttering

Sustainability and the Environment: Encouraging active and sustainable travel

Encourage, promote and support more cycling and walking for local trips to reduce congestion, improve air quality and support better health

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Sustainability and the Environment

Encouraging active and sustainable travel

Sustainability and the Environment: Managing construction sites & infrastructure works coordination

Ensure construction sites have management plans and also work with utility companies to coordinate works

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Sustainability and the Environment

Managing construction sites & infrastructure works coordination

Sustainability and the Environment: Modernising traffic signals

Where needed, work with TfL to modernise signal operations in order to reduce vehicle delays and maximise pedestrian crossing timings

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Sustainability and the Environment

Modernising traffic signals

Sustainability and the Environment: New trees and greening

Identify opportunities for tree planting to support climate resilience and support biodiversity in particular between Park Walk and Carlysle Street

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Sustainability and the Environment

New trees and greening

Sustainability and the Environment: Reducing emissions from buildings

Promote and deliver government funded carbon and energy assessments of buildings and support businesses in introducing energy and carbon reduction measures

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Sustainability and the Environment

Reducing emissions from buildings

Sustainability and the Environment: Reducing kerbside deliveries

Introduce micro-consolidation centre to reduce the number of delivery vehicles, review loading timings and work with businesses to ensure deliveries take place at designated times and locations

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Sustainability and the Environment

Reducing kerbside deliveries

Sustainability and the Environment: Shopfront greening strategy

Extend the existing greening of shop fronts and forecourts and introduce a street-wide design code for greening frontages.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Sustainability and the Environment

Shopfront greening strategy

Sustainability and the Environment: Supporting electric vehicles

As part of wider streetscape improvements seek location specific opportunities to introduce electric vehicle charging points.

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Sustainability and the Environment

Supporting electric vehicles

Sustainability and the Environment: Wayfinding

Explore opportunities to for informal wayfinding using heritage and cultural assets; activate Sloane Square station with wayfinding information, review and improve Legible London and introduce way-finding to and from cycle routes

Status

Not Commenced
Development
Design
Build
Completed

Feedback form

You are providing feedback for:

Sustainability and the Environment

Wayfinding